I-49/MLK Jr. Interchange
Project Type
Ready Mix Concrete
Location
Fayetteville
Owner: ArDOT
General Contractor: Manhattan Road & Bridge (Tulsa, OK) and APAC-Central, Inc. (Fayetteville, AR) – Joint Venture
Subcontractors/Key Contractors:
Nabholz Construction Corporation (Rogers, AR) – mass earthwork
Time Striping, Inc. (Van Buren, AR) – maintenance of traffic and roadway striping
Envirotrac Safety & Erosion, Inc. (Danville, AR) – erosion control
TLS Group, Inc. (Oklahoma City, OK) – traffic signalization and roadway lighting
Creative Designs Concepts, Inc. (Van Buren, AR) – overhead sign structures
Materials Used on Project and Quantities:
- Ready Mix Concrete – 13,000 cubic yards
The I-49/MLK Jr. Interchange marks ArDOT’s second CMGC project through its Alternative Delivery Division and the first in Northwest Arkansas. The project includes widening roughly 2 miles of I-49 from four to six lanes, expanding about 1 mile of Highway 62 to six lanes with a raised median, and constructing a new 15th Street overpass with roundabouts and related street improvements. APAC-Central/SMG supplied 100% of the ready-mix concrete for the project, totaling approximately 13,000 cubic yards.